Engineers Judy Muya and Leonald Mungai visited Diaspora University Town (DUT) to explore opportunities to be part of the project. Dan Kamau, the DUT project director, welcomed them and invited them to be part of the project by becoming townhouse developers and participating in the design-build plan with a budget of Ksh 39.5 billion. The DUT design-build plan aims to deliver 60 km of roads and infrastructure network and approximately 3,700 buildings on some of the 3,778 plots.

Dan, who previously worked for a design-build company that integrated engineering, construction, equipment, and trucks, informed the engineers that the design-build plan consists of 300 production contracts. These contracts are divided into 20 contracts for the roads and infrastructure network, 175 for the townhouses, and 95 for university, MSMEs, and organization properties.

Dan also mentioned that the Diaspora University School of Engineering will support the growth of the design-build sector. He emphasized the importance of the design-build system in the U.S., which has contributed to the strength of roads, infrastructure, and housing. He cited examples of top design-build companies in the U.S. and their construction work.

The engineers, who have experience in various projects and possess diverse construction equipment, appreciated DUT's approach focused on job creation, wealth creation, and environmental sustainability. They expressed their intention to join DUT as townhouse developers and participate in the Ksh 39.5 billion budget.

Email dan@dut.or.ke to get information on how to join the design-build plan.

STEP BY STEP PROCESS OF DEVELOPING A DUT TOWNHOUSE

STEP 1. KSH 750,000

Visit a bank and borrow Ksh 750,000 through the bank's Personal Unsecured Loan products. Some of the Bank products that will make the loan repayment below Ksh 15,000 a month are:

KCB Bank Personal Unsecured Check-Off Loan

https://ke.kcbgroup.com/for-you/get-a-loan/unsecured-loan/check-off

Get a check-off loan as a government employee, or a company that has an agreement with KCB Bank. The check-off loan of Kes 20,000 up to Kes 10 Million is repayable in up to 120 months (10 years), with monthly repayments remitted by your employer.

Coop Bank Personal Unsecured Check-off Loan

https://www.co-opbank.co.ke/borrow/personal-loan/

Minimum loan amount of Ksh 50,000. Maximum loan amount: KES 10,000,000. Maximum term of up to 132 months (11 years)

DTB Bank Personal Unsecured Loan

https://dtbk.dtbafrica.com/account/unsecured-loan

Check off Non-Check loan, unsecured loan. Minimum Kes 50,000 up to Kes 6 Million. Tenor 96 months (8 years).

ABSA Bank Personal Unsecured Loan

https://www.absabank.co.ke/personal/get-a-personal-loan/#personalloancalculator

Borrow up to KES6,000,000 with no collateral required as security. Flexible repayment options up to 96 months

Monthly Payments of Loans based on 16% Interest

Based on a 16% interest rate, the monthly payments for the maximum loan period would be: Co-op Bank, Ksh 12,107; KCB Bank, Ksh 12,563; DTB, Ksh 13,897; and ABSA, Ksh 13,897.

Note that the bank's interest rate would determine the actual amount.

https://dut.or.ke/thd

STEP 2. DUT-THIDA

Sign a DUT Townhouse Investment and Development Agreement (THIDA) https://dut.or.ke/THIDA2025.pdf and put the Ksh 750,000 in the Diaspora University Trust account.

At this point, a DUT townhouse developer file will be open and will start developing one townhouse.

https://dut.or.ke/thd

STEP 3. PAY INSTALLMENTS AS THE DUT DEVELOPS THE TOWNHOUSE

Pay the monthly installments to your bank.

DUT, on the other hand, will develop the townhouse in accordance with THIDA Article 4.

In about 12–48 months, the DUT Design-Build plan will complete the townhouse.

STEP 4. COMPLETED HOUSE MORTGAGE

Upon completion of the house, get a KMRC mortgage through your bank.

The mortgage at this point can include the Principal Balance of the unsecured loan (Step 1), and the House Development Cost (THIDA Article 4).

The table in step 1 illustrates how the principal balance is incorporated into a mortgage.

STEP 5. COMPLETED HOUSE USAGE

The owner can occupy their house and live in a well-planned town with a clean and healthy environment, a University, a level 5/6 university hospital, good basic education schools for children, and other amenities.

If the owner does not live in the house, the owner can lease the house to DUT in accordance with THIDA Article 12 and receive Ksh 65,000 a month.

STEP 6. COMPLETED HOUSE EQUITY

Upon completion, each house will have equity calculated as Sale Price less the mortgage value. The sale prices are recorded in the DUT THD page https://dut.or.ke/thd

  1. Year 1 Sale Price. Ksh 8 million
  2. Year 2 Sale Price Ksh 8.5 million
  3. Year 3 Sale Price Ksh 9 million
  4. Year 4 Sale Price Ksh 9.5 million
  5. Year 5 onward Market Price.

GDP GROWTH APPROACH

DUT uses the GDP Growth approach, which has grown the U.S. economy from $57 billion to the current $30 trillion. DUT will achieve a GDP of Ksh 20 billion.

https://dut.or.ke/
https://dut.or.ke/